Daytime and overnight ramp closures for paving work planned in Vancouver through the end of July – ClarkCountyToday.com

Date: Thursday, July 15, 2021

Upkeep groups will start renewing sections of I-5 heading north and a number of other entrances and exits alongside the highways within the space to protect and prolong the helpful lifetime of the lane

VANCOUVER – People utilizing Interstate 5, State Route 500, and State Route 14 in Vancouver should plan for delays by the tip of the month.

Beginning subsequent week, Washington State Division of Transportation upkeep groups will start renewing sections of I-5 heading north and a number of other entrances and exits alongside the freeway to protect and prolong the helpful lifetime of the pavement.

Ramp closures in a single day

The crews will shut the next ramps in a single day from 10:00 p.m. to five:00 a.m.:

  • Monday nineteenth July: The SR 14 ramp west to I-5 north and the I-5 exit north to Mill Plain Boulevard and Fourth Plain Boulevard.
  • Tuesday twentieth July: The I-5 exit north to Mill Plain Boulevard and Fourth Plain Boulevard and the Mill Plain Boulevard ramp to I-5 north.
  • Wednesday July twenty first and Thursday July twenty second: Mill Plain Boulevard and Fourth Plain Boulevard lead north onto the driveways for I-5.
  • Sunday, July twenty fifth and Monday, July twenty sixth: The east and west SR 500 will exit the ramps to St. Johns Boulevard.
  • Tuesday, July twenty seventh and Wednesday, July twenty eighth: The St. Johns Boulevard driveway to SR 500 west and the SR 500 exit west to Northeast fifteenth Road.
  • Thursday, July twenty ninth: Northeast fifteenth Road driveway to SR 500 heading east.
  • Friday, July thirtieth: The driveway to St. Johns Boulevard to SR 500 to the east.

Ramp closures through the day

  • Thursday July twenty second: The departures from each instructions of the SR 14 to Lieser Straße will probably be closed from 4:00 a.m. to 2:00 p.m.
  • Friday, July twenty third: The departure of SR 14 in a westerly path to Evergreen Boulevard will probably be closed from 4:00 a.m. to 2:00 p.m.
  • Friday, July twenty third: The SR 500 japanese exit to Falk Highway will probably be closed from 4:00 a.m. to five:00 p.m.
  • Monday, July twenty sixth: The japanese exit of SR 14 to Evergreen Boulevard will probably be closed from 4:00 a.m. to 2:00 p.m.
  • Tuesday, July twenty seventh: The departures from each instructions of the SR 14 to Evergreen Boulevard will probably be closed from 4:00 a.m. to 2:00 p.m.
  • Tuesday, July twenty seventh: The SR 500 japanese exit to Falk Highway will probably be closed from 4:00 a.m. to five:00 p.m.

Whereas the ramps are closed, vacationers should select another route. As with every freeway building venture, vacationers should train warning within the work space and scale back pace to make sure your security and that of freeway staff. It is usually the legislation. The fines are doubled in constructing zones. Following warning indicators and directions from freeway staff advantages everybody who shares the lane.

[ad_2]